Yep! Generally if your weld breaks before the material in the HAZ it is considered a bad weld and certified welders working under structural standards are generally required to produce welds that are stronger than this.
(Not actually a certified welder right now, but I have a brief familiarity with the D1 structural standards as getting a cert is something I've looked into.)